LTA - Thomson–East Coast Line 2 in Operation

 LTA - Thomson–East Coast Line 2 in Operation (2021 0902)

Operate Date: 28th August 2021

Train Cabin Manufacturer: CRRC Qingdao Sifang Co Ltd 中车青島四方机车车辆股份有限公司

The trains manufactured by Kawasaki Heavy Industries (KHI) & CRRC Qingdao Sifang under Contract T251 (CT251) are the first generation electric multiple unit rolling stock in operation on the Thomson–East Coast line of Singapore's Mass Rapid Transit (MRT) system.

Interior of one of the cabin

Operating Stations:

Springleaf (TE4)

Springleaf station is located along Upper Thomson Road, between Thong Soon Green and Springleaf Road.


Lentor (TE5)

Adjacent to the Lentor Estate and Teacher’s Estate


Mayflower (TE6)

Is located in Ang Mo Kio and Kebun Baru estate, Mayflower Market and Food Centre


Bright Hill (TE7)

Is located along Sin Ming Avenue and will be a future interchange station with the CRL


Upper Thomson (TE8)

Serve the neighboring Soo Chow Estate, Thomson Plaza, Church of the Holy Spirit, and various dining establishments along Upper Thomson Road.


Caldecott (TE9,CC17)

An interchange station, connecting commuters on TEL to CCL, easier access MacRitchie Reservoir.






Comments